
Our Work
Markets We Serve
From complex site development to large-scale civil infrastructure, E.S. Wagner brings the people, equipment, and expertise to serve a diverse range of industries.
Proven Across 8 Specialized Sectors
ESW delivers technical accuracy and operational excellence to a broad spectrum of heavy civil, transportation, and site development sectors. Backed by our extensive fleet of specialized equipment and seasoned field professionals, we perform critical civil scopes that ensure structural durability and strict regulatory compliance. Explore the markets we serve to find out how we deliver proven solutions to every jobsite.
Commercial & Industrial
Comprehensive self-performed site development solutions, utilizing our expansive fleet of specialized equipment.
Transportation
Decades of experience in building, improving, and maintaining critical interstate road and bridge infrastructure.
Airport Construction
Constructing and enhancing the infrastructure essential for efficient airport operations in the highly complex and technical environment of active airfields.
Water & Wastewater Facilities
Comprehensive water treatment infrastructure solutions, self-performed across multiple disciplines to deliver reliable, efficient systems.
Energy Services
Turnkey site development and heavy civil construction services that support the reliable delivery of power, utility, and energy infrastructure.
Rail Facilities
Developing and improving rail and intermodal infrastructure, delivering safe, efficient facilities that keep freight and transportation networks moving.
Earthen Containment
Specialized construction of engineered containment systems designed to provide long-term retention, environmental protection, durability, and performance.
Flood Control Systems
Building resilient flood control infrastructure that safeguards communities, critical assets, and natural resources from changing water conditions.
Success is Measured by Results.
We’ve built our reputation on delivering results. From moving over 111 million cubic yards of earthwork to installing nearly 1 million linear feet of underground utilities, our numbers reflect the scale, expertise, and reliability behind every project. And when it comes to meeting commitments, our record speaks for itself: Deadlines Missed: ZERO.
Over the Last Two Decades:
111,678,024
CY Earthwork
995,925
LF Underground Utilities
212,519
CY Structural Concrete
364,707
LF Deep Foundations
4,359,850
TN Aggregate Base
ZERO
Deadlines Missed
Projects by Sector
-

GREENSBORO EASTERN LOOP — FROM US 29 TO SR-2303
Guilford County, NC
3.4M CY
Excavation
2.3M CY
Borrow Excavation
-

US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — HANCOCK/WYANDOT
Ohio
2.0M CY
Excavation
2.4M CY
Borrow Excavation
-

-

I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING
Perrysburg, OH
316,800 SY
9” Concrete Pavement Removal
206,000 TN
Aggregate/Granular Embankment
-

ANTHONY WAYNE BRIDGE REHABILITATION — HIGH-LEVEL SUSPENSION BRIDGE CONSTRUCTION
Toledo, OH
1,252 LF
Suspension Span Rehabilitation
8550 CY
Structural Concrete
-

I-69 NEW HIGHWAY — ALIGNMENT AND STRUCTURES
Bloomington, IN
3.9M CY
Earthwork
9
Bridge Structures
-

MARTIN LUTHER KING JR. BRIDGE — MULTI-USE PATH – CITY OF TOLEDO
Toledo, OH
5,400 CFT
Concrete Hand Demolition
475K LBS
Counterweight Steel Hand Placed During Construction & Final Balancing
-

COUNTY ROAD 17D/US24 INTERCHANGE — ODOT 250079
Napoleon, OH
170K CY
Earthwork
1,300 CY
Structural Concrete
-

WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73
Wilmington, OH
19,000 SY
Self-Performed Concrete Pavement
1.9M CY
Borrow Excavation
-

In Progress
SCDOT D — B BRIDGE PACKAGE 20 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT
South Carolina
3
Bridges Totaling 2,070 LF of Cored Slabs
4
Bridges Totaling 6,622 LF of Box Beams
-

SCDOT D — B BRIDGE PACKAGE 15 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT
South Carolina
2
Bridges Totaling 1,830 LF of Cored Slabs
3
Bridges Totaling 6,140 LF of Box Beams
-

US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — WYANDOT/CRAWFORD
Ohio
16
Bridge Structures
2.3M CY
Borrow Excavation
