I75 - I475 (US23) Interchange — E.S. Wagner project photo

Our Work / Projects / I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING

I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING

Sector

Transportation

Client

ODOT

Location

Perrysburg, OH

State

Ohio

Status

Complete

Site Size

210 Acres

By the Numbers

Metrics

316,800 SY

9” Concrete Pavement Removal

206,000 TN

Aggregate/Granular Embankment

263,000 CY

Earthwork

10,300 LF

Underground Utilities

377,000 LF

6” Underdrains

163,000 SY

13.5” Non-Reinforced Concrete Pavement

Challenge

Widening and reconstructing a heavily traveled six-mile segment of I-75, including the reconstruction and realignment of the I-75/I-475 interchange in Perrysburg, Ohio. Improvements included rebuilding multiple ramps, constructing a new ramp bridge, and rehabilitating an existing bridge.

Solution

E.S. Wagner Company made extensive updates to the Maintenance of Traffic plan to produce a safer, more productive, and schedule-efficient workflow. A 120-day closure of the I-75/I-475 interchange was implemented, and numerous earthwork and structure construction crews were deployed to complete the complex grading and structure scopes. ESW’s approach allowed for an on-time opening of the critically important interchange, and numerous value engineering proposals resulted in overall cost savings to the Ohio Department of Transportation.

I75 - I475 (US23) Interchange — E.S. Wagner project photo

Project Scope

E.S. Wagner Company completed the highway widening and rebuilding of six miles of I-75 and the I-475 (US 23) interchange in Perrysburg, Ohio. The job included 263,000 cubic yards of excavation, the removal of over 316,000 square yards of existing concrete pavement, and the installation of over 70 miles of storm drain and new utilities. The work required the construction of one new ramp bridge in a location that was previously solid ramp embankment that was removed to allow for the structure construction and the rehabilitation of an existing bridge during a 120-day interchange closure. ESW’s self-performance capability was a critical element of this project, allowing for control of the aggressive timeline and completion milestones. ESW was able to safely execute the completion of this project both ahead of schedule and under budget.

Keep Exploring

Related Projects

  • I-75 Downtown Toledo — E.S. Wagner project photo

    I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION

    Toledo, OH

    33,000 CY

    of Structural Concrete

    21,503,447

    lbs. of Structural Steel Erected

  • GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II — E.S. Wagner project photo

    GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II

    Toledo, OH

    384,000

    Tons Solid Waste Removal

    2.2M

    Gallons Regulated Water Management

  • Wilmington Bypass State Route 73 — E.S. Wagner project photo

    WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73

    Wilmington, OH

    19,000 SY

    Self-Performed Concrete Pavement

    1.9M CY

    Borrow Excavation