GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II — E.S. Wagner project photo

Our Work / Projects / GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II

GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II

Sector

Transportation

Client

ODOT

Location

Toledo, OH

State

Ohio

Status

Complete

By the Numbers

Metrics

384,000

Tons Solid Waste Removal

2.2M

Gallons Regulated Water Management

465,000 CY

Excavation

155,000 CY

Crushed Rock Fill

29,000 LF

Storm Drainage

74,000 CY

Aggregate Base

8100

Tons Hazardous and PCB Contaminated Waste

6.0M

Gallons Non-Regulated Water Management

7900 LF

Driven Foundation Piles

1200 CY

Structural Concrete for Bridges

Challenge

Constructing a new highway corridor and interstate interchange through wetlands, former industrial dump sites, and contaminated groundwater zones, requiring extensive environmental remediation, including the removal and treatment of hundreds of thousands of tons of contaminated materials, management of hazardous and PCB waste, and treatment of millions of gallons of impacted groundwater, all while maintaining an aggressive construction schedule and coordinating multiple phases of work.

Solution

E.S. Wagner’s in-house environmental construction expertise and advanced planning allowed for the successful integration of complex environmental remediation and heavy civil construction operations, carefully sequencing the project to allow for the removal of contaminated soils, hazardous waste, and impacted groundwater while advancing roadway, bridge, and interchange construction in parallel and without delay caused by waste collection, testing, and classification. Once complete with the work, ESW’s staff often provided recommendations to ODOT on subsequent projects that involved similar remediation efforts.

GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II — E.S. Wagner project photo

Project Scope

E.S. Wagner Company completed the two-phase Greenbelt Parkway corridor project for the Ohio Department of Transportation (ODOT), creating a critical connection between Interstate 280, downtown Toledo, and the city’s north end. The first phase involved construction of 1.5 miles of four-lane divided highway and one of ODOT’s first major roadway projects incorporating large-scale environmental remediation, including the removal, stabilization, and disposal of contaminated and hazardous materials. The second phase included construction of a new I-280 interchange and three major bridge structures, along with extensive earthwork and groundwater remediation requiring on-site treatment of more than 6 million gallons of impacted water. Despite these complex environmental challenges that could have delayed the projects, E.S. Wagner delivered the corridor on schedule, providing uninterrupted regional access through northwest Ohio – and became an advisor to the Department on future projects requiring environmental remediation.

Keep Exploring

Related Projects

  • I75 - I475 (US23) Interchange — E.S. Wagner project photo

    I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING

    Perrysburg, OH

    316,800 SY

    9” Concrete Pavement Removal

    206,000 TN

    Aggregate/Granular Embankment

  • I-75 Downtown Toledo — E.S. Wagner project photo

    I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION

    Toledo, OH

    33,000 CY

    of Structural Concrete

    21,503,447

    lbs. of Structural Steel Erected

  • Wilmington Bypass State Route 73 — E.S. Wagner project photo

    WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73

    Wilmington, OH

    19,000 SY

    Self-Performed Concrete Pavement

    1.9M CY

    Borrow Excavation