WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73
By the Numbers
Metrics
19,000 SY
Self-Performed Concrete Pavement
1.9M CY
Borrow Excavation
6
Miles of New 4-Lane Highway
2
Interchanges
450K CY
Excavation
47,500 LF
4″-144″ Storm Drainage
216,000 LF
of Underdrain Systems
10
Bridge Structures
7,300 CY
Structural Concrete
43,000 SF
of MSE walls
Challenge
Complete the final two segments of the US 73 Wilmington, Ohio Bypass, overcoming weak, saturated soils throughout the corridor, while maintaining schedule and safety requirements.
Solution
Faced with unexpectedly challenging soil conditions that were compounded by an unseasonably wet first construction season on the corridor, E.S. Wagner totally modified the planned approach to completing the project earthmoving, shifting away from the unrestricted application of the company’s most productive equipment to more versatile, low ground pressure methods. The team removed and replaced unsuitable soils with engineered embankment material, completing 73,000 CY of undercut. Finally, ESW developed and implemented an optimized traffic control plan that enabled a safe, efficient tie-in to existing SR-73 while maintaining the project schedule.

Project Scope
E.S. Wagner served as the prime contractor for two phases of the SR-73 Wilmington Bypass for ODOT District 8. The project included six miles of new four-lane highway, interchanges at US-68 and SR-22/3, 2.5 million cubic yards of total earthwork, ten bridge structures, and 43,000 square feet of mechanically stabilized earth (MSE) walls. After several years of local drought, the local weather pattern turned extremely wet, impacting the sandy, silty soils on site and forcing a total departure from ESW’s bid approach to the earthwork and grade preparation. Despite the challenging subsurface conditions, the team successfully delivered the project through ESW’s ability to pivot resources, innovative engineering solutions, proactive traffic management, and close coordination with ODOT. Completion of the bypass improved regional mobility, enhanced safety, and provided a critical transportation corridor around Wilmington.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION
Toledo, OH
33,000 CY
of Structural Concrete
21,503,447
lbs. of Structural Steel Erected
-

I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING
Perrysburg, OH
316,800 SY
9” Concrete Pavement Removal
206,000 TN
Aggregate/Granular Embankment
-

GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II
Toledo, OH
384,000
Tons Solid Waste Removal
2.2M
Gallons Regulated Water Management