Sector
Transportation
-

I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION
Toledo, OH
33,000 CY
of Structural Concrete
21,503,447
lbs. of Structural Steel Erected
-

GREENSBORO EASTERN LOOP — FROM US 29 TO SR-2303
Guilford County, NC
3.4M CY
Excavation
2.3M CY
Borrow Excavation
-

US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — HANCOCK/WYANDOT
Ohio
2.0M CY
Excavation
2.4M CY
Borrow Excavation
-

-

I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING
Perrysburg, OH
316,800 SY
9” Concrete Pavement Removal
206,000 TN
Aggregate/Granular Embankment
-

ANTHONY WAYNE BRIDGE REHABILITATION — HIGH-LEVEL SUSPENSION BRIDGE CONSTRUCTION
Toledo, OH
1,252 LF
Suspension Span Rehabilitation
8550 CY
Structural Concrete
-

I-69 NEW HIGHWAY — ALIGNMENT AND STRUCTURES
Bloomington, IN
3.9M CY
Earthwork
9
Bridge Structures
-

MARTIN LUTHER KING JR. BRIDGE — MULTI-USE PATH – CITY OF TOLEDO
Toledo, OH
5,400 CFT
Concrete Hand Demolition
475K LBS
Counterweight Steel Hand Placed During Construction & Final Balancing
-

COUNTY ROAD 17D/US24 INTERCHANGE — ODOT 250079
Napoleon, OH
170K CY
Earthwork
1,300 CY
Structural Concrete
-

WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73
Wilmington, OH
19,000 SY
Self-Performed Concrete Pavement
1.9M CY
Borrow Excavation