Sector

Transportation

  • SCDOT DB Bridge Package 20 — E.S. Wagner project photo

    In Progress

    SCDOT D — B BRIDGE PACKAGE 20 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT

    South Carolina

    3

    Bridges Totaling 2,070 LF of Cored Slabs

    4

    Bridges Totaling 6,622 LF of Box Beams

  • SCDOT DB Package 15 — E.S. Wagner project photo

    SCDOT D — B BRIDGE PACKAGE 15 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT

    South Carolina

    2

    Bridges Totaling 1,830 LF of Cored Slabs

    3

    Bridges Totaling 6,140 LF of Box Beams

  • US-30 Roadway and Bridge Construction — E.S. Wagner project photo

    US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — WYANDOT/CRAWFORD

    Ohio

    16

    Bridge Structures

    2.3M CY

    Borrow Excavation

  • GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II — E.S. Wagner project photo

    GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II

    Toledo, OH

    384,000

    Tons Solid Waste Removal

    2.2M

    Gallons Regulated Water Management