SCDOT DB Bridge Package 20 — E.S. Wagner project photo

Our Work / Projects / SCDOT D — B BRIDGE PACKAGE 20 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT

SCDOT D — B BRIDGE PACKAGE 20 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT

Sector

Transportation

Client

SCDOT

Location

South Carolina

State

South Carolina

Status

In Progress

By the Numbers

Metrics

3

Bridges Totaling 2,070 LF of Cored Slabs

4

Bridges Totaling 6,622 LF of Box Beams

23,000 CY

of Borrow Excavation

6,500 TN

Asphalt

Challenge

Managing a seven-bridge design-build package across four counties with varying hurdles, including strict environmental rules, right-of-way limits, and major utility conflicts.

Solution

E.S. Wagner Company used fast-track scheduling and early design planning to finish all seven bridges ahead of schedule. For S-20, ESW pushed construction from zero plans or permits to an open bridge in a record 147 days—203 days early. For S-998, the team used the 120’ beam span to control costs and keep the timeline predictable, setting a state record for length.

SCDOT DB Bridge Package 20 — E.S. Wagner project photo

Project Scope

E.S. Wagner Company delivered the design-build replacement of seven box beam and cored slab bridges across Chesterfield, York, Fairfield, and Lancaster Counties, providing complete services including design coordination, environmental permitting, utility coordination, roadway construction, and bridge installation. The project included approximately 23,000 CY of borrow excavation, 1.1 miles of roadway construction with associated safety improvements, and 6,500 tons of asphalt. The bridge package also featured construction of South Carolina’s first 120-foot box beam span. Through proactive planning and efficient execution, E.S. Wagner completed the work well ahead of schedule, including opening the S-20 bridge 200 days early. The team met all technical requirements while earning high praise from SCDOT for delivering the entire bridge program ahead of schedule.

Keep Exploring

Related Projects

  • SCDOT DB Package 15 — E.S. Wagner project photo

    SCDOT D — B BRIDGE PACKAGE 15 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT

    South Carolina

    2

    Bridges Totaling 1,830 LF of Cored Slabs

    3

    Bridges Totaling 6,140 LF of Box Beams

  • Wilmington Bypass State Route 73 — E.S. Wagner project photo

    WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73

    Wilmington, OH

    19,000 SY

    Self-Performed Concrete Pavement

    1.9M CY

    Borrow Excavation

  • US-74 Shelby Bypass — E.S. Wagner project photo

    US-74 SHELBY BYPASS — NC-226 TO NC-150

    Shelby, NC

    5.85M CY

    Excavation

    27

    Bridges