SCDOT DB Package 15 — E.S. Wagner project photo

Our Work / Projects / SCDOT D — B BRIDGE PACKAGE 15 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT

SCDOT D — B BRIDGE PACKAGE 15 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT

Sector

Transportation

Client

SCDOT

Location

South Carolina

State

South Carolina

Status

Complete

By the Numbers

Metrics

2

Bridges Totaling 1,830 LF of Cored Slabs

3

Bridges Totaling 6,140 LF of Box Beams

16,000 CY

of Borrow Excavation

5,000 TN

Asphalt

Challenge

Rebuilding four bridges scattered across four different counties required careful scheduling and distinct site setups. The biggest obstacle was at Bridge S-53, where the crew had to find a way to get heavy equipment and materials in and out of a protected, hard-to-reach wetland area without damaging the surrounding environment or stalling the timeline.

Solution

ESW finished the entire four-bridge package on time and under budget. For the wetland bottleneck at S-53, the field teams put together a targeted access plan to work safely through the wetland. At Bridge S-765, the team and its design partners reviewed the state’s initial plans and found a better approach, shortening the bridge and providing a cost reduction to the owner.

SCDOT DB Package 15 — E.S. Wagner project photo

Project Scope

E.S. Wagner Company took on the design-build delivery of four cored slab and box beam bridges across Anderson, Chester, Chesterfield, and Lancaster counties, providing services from design re-evaluation and permitting through environmental compliance, utility coordination, roadway construction, and final bridge installation. The project included approximately 16,000 CY of borrow excavation, 0.5 miles of roadway construction, and 5,000 tons of asphalt across multiple sites. Utility coordination was a critical project component, as it represents one of the greatest risks for schedule delays. A major success resulted from an early design review of Bridge S-765, where E.S. Wagner and its design partners reduced the required bridge span from 200 feet to 140 feet while maintaining all safety and performance requirements. This design optimization generated more than $200,000 in cost savings for SCDOT and highlighted the value of the design-build delivery approach.

Keep Exploring

Related Projects

  • SCDOT DB Bridge Package 20 — E.S. Wagner project photo

    In Progress

    SCDOT D — B BRIDGE PACKAGE 20 — DESIGN-BUILD BRIDGE REPLACEMENTS – SCDOT

    South Carolina

    3

    Bridges Totaling 2,070 LF of Cored Slabs

    4

    Bridges Totaling 6,622 LF of Box Beams

  • Wilmington Bypass State Route 73 — E.S. Wagner project photo

    WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73

    Wilmington, OH

    19,000 SY

    Self-Performed Concrete Pavement

    1.9M CY

    Borrow Excavation

  • US-74 Shelby Bypass — E.S. Wagner project photo

    US-74 SHELBY BYPASS — NC-226 TO NC-150

    Shelby, NC

    5.85M CY

    Excavation

    27

    Bridges