GREENSBORO EASTERN LOOP — FROM US 29 TO SR-2303
By the Numbers
Metrics
3.4M CY
Excavation
2.3M CY
Borrow Excavation
820,000 SY
of Geotextile
64,000 LF
Storm Drainage
420
Drainage Structures
578,000 TN
of Aggregate
Challenge
Complete the final five miles of I-840 (Greensboro Loop) requiring massive borrow material acquisition and import, extensive bridge construction, utility coordination, traffic management, and large-scale on-site excavation in an urban environment. Endure the three wettest years on local record, pandemic-related disruptions, delayed utility relocations, continuously evolving site conditions, and an NCDOT requested acceleration and partial opening while maintaining overall project momentum.
Solution
ESW purchased several parcels of property immediately adjacent to the project to secure the project’s needed borrow material. Through close partnership with NCDOT, E.S. Wagner Company and Smith-Rowe, LLC negotiated two separate agreements, one to accelerate a portion of the project, and one to use chemical drying to facilitate wintertime grade preparation in order to offset global pandemic and utility relocation related schedule impacts and delivered the project on schedule despite significant challenges.

Project Scope
E.S. Wagner Co., LLC, in a Joint Venture partnership with Smith- Rowe, LLC, alongside dedicated subcontractors, completed the final five miles of Interstate 840 around Greensboro, NC. Officially opened to traffic in Q1 of 2023, the project finalized the city’s Urban Loop, creating a vital transportation corridor designed to ease congestion on existing infrastructure and significantly reduce travel times for the traveling public. The extensive scope of work encompassed mass excavation and embankment, underground utility installation, reinforced concrete box culverts, bridges, soil nail walls, shoring, concrete paving, erosion control, and multiple complex traffic switches. Despite facing severe external challenges—including operating through the three wettest years on record and navigating a global pandemic—the Joint Venture and NCDOT collaborated closely throughout the life of the project. By making constant adjustments and driving acceleration, the team opened a key two-mile segment nearly two years early, ultimately delivering infrastructure that will benefit the region for generations to come.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73
Wilmington, OH
19,000 SY
Self-Performed Concrete Pavement
1.9M CY
Borrow Excavation
-

-

US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — WYANDOT/CRAWFORD
Ohio
16
Bridge Structures
2.3M CY
Borrow Excavation
From Proof to Partnership
Have a Project Like This?
Bring us your site and scope — we'll show you how E.S. Wagner delivers it.