US-74 SHELBY BYPASS — NC-226 TO NC-150
By the Numbers
Metrics
5.85M CY
Excavation
27
Bridges
63,000 LF
Storm Drainage
49,600 LF
Wet Utilities
510,000
Tons Aggregate Base
5300 CY
Structural Concrete
298,000 SF
Concrete Deck Slab
43,300 LF
Driven Foundation Pile
1.2M LB
Reinforcing Steel
52,000 SF
MSE Wall
Challenge
Construct 12 miles of new interstate with six full interchanges and over eight miles of state and local routes through aggressive North Carolina terrain. The corridor required 27 new bridges up to 560’ long, including three over rivers and two over railroads. Challenging earthwork demanded excavation in materials varying from light silts to mass rock.
Solution
E.S. Wagner utilized temporary bents for several of the longer steel girder bridges, built four temporary bridges, and effectively managed soils so the best excavated materials could be most effectively used. By delaying earthwork and prioritizing bridge construction as access through the project, the team was able to accomplish off- road hauls approaching 4.5 miles to achieve an earthwork balance that minimized the need for borrow or waste.

Project Scope
As prime contractor for the first three segments of the US 74 Shelby Bypass, E.S. Wagner helped deliver a major NCDOT corridor project that spanned more than 12 years and endured significant challenges, including utility relocation delays, record rainfall events, and pandemic-related labor and supply disruptions. Through close coordination with NCDOT and innovative construction planning, ESW maintained progress despite factors beyond either party’s control. Key innovations included four temporary bridges, one of which carried live traffic, allowing bridge construction and mass earthmoving operations to proceed safely and efficiently. The project involved nearly 6 million CY of excavation across highly variable geology, including blasted rock cuts and fills up to 60 feet tall. ESW completed 27 bridges supported by nearly 44,000 LF of driven piles and incorporating 5,300 CY of structural concrete, 1.2 million pounds of reinforcing steel, and 52,000 SF of MSE wall. The work also included more than 110,000 LF of underground piping, underscoring the scale and complexity of the bypass program.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

COUNTY ROAD 17D/US24 INTERCHANGE — ODOT 250079
Napoleon, OH
170K CY
Earthwork
1,300 CY
Structural Concrete
-

I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING
Perrysburg, OH
316,800 SY
9” Concrete Pavement Removal
206,000 TN
Aggregate/Granular Embankment
-

I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION
Toledo, OH
33,000 CY
of Structural Concrete
21,503,447
lbs. of Structural Steel Erected
From Proof to Partnership