I-75 Downtown Toledo — E.S. Wagner project photo

Our Work / Projects / I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION

I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION

Sector

Transportation

Client

ODOT

Location

Toledo, OH

State

Ohio

Status

Complete

By the Numbers

Metrics

33,000 CY

of Structural Concrete

21,503,447

lbs. of Structural Steel Erected

108,000 FT

of Driven Foundation Pile

30,000 SF

of Noise Barrier Wall

17,300 FT

– 6”-60” Diameter Storm/Sanitary Sewer

237,000 CY

of Excavation

47,000 SF

of MSE Wall Construction (9 EA separate walls)

Challenge

Constructing 11 bridges and removing 8 existing structures, including crossings over an active rail yard and a major interchange, and reconstructing the entire interstate and the primary interchange feeding downtown Toledo, while maintaining traffic through highly coordinated, multi-phase construction plan featuring 27 individual milestones, all amid pandemic related labor and material shortages.

Solution

ESW deployed extensive manpower, management, and equipment resources to support near-continuous day and night shifts, maintaining progress despite severe resource constraints and COVID-19 safety requirements. Success required more than 550,000 self-performed labor hours and detailed scheduling down to the day, enabling the team to achieve all 27 milestones over the four-year project, each carrying $1,000-per-hour liquidated damages.

I-75 Downtown Toledo — E.S. Wagner project photo

Project Scope

E.S. Wagner Company completed this major highway infrastructure modernization project for the Ohio Department of Transportation (ODOT) in Toledo, Ohio. The project widened a 1.8-mile stretch of Interstate 75 and a 1.0-mile section of the Anthony Wayne Trail by reclaiming unused space between parallel lanes to add capacity. The scope included demolition and replacement of 11 bridges, removing 11.3 million pounds of structural steel and 10,400 cubic yards of concrete, installing 56,000 square feet of temporary steel sheet piling, and rebuilding 13 ramps. Despite significant supply chain and labor challenges, ESW met all major milestones and delivered the project with zero liquidated damages.

Keep Exploring

Related Projects

  • Wilmington Bypass State Route 73 — E.S. Wagner project photo

    WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73

    Wilmington, OH

    19,000 SY

    Self-Performed Concrete Pavement

    1.9M CY

    Borrow Excavation

  • I75 - I475 (US23) Interchange — E.S. Wagner project photo

    I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING

    Perrysburg, OH

    316,800 SY

    9” Concrete Pavement Removal

    206,000 TN

    Aggregate/Granular Embankment

  • GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II — E.S. Wagner project photo

    GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II

    Toledo, OH

    384,000

    Tons Solid Waste Removal

    2.2M

    Gallons Regulated Water Management