MLK Bridge Multi-use Paths — E.S. Wagner project photo

Our Work / Projects / MARTIN LUTHER KING JR. BRIDGE — MULTI-USE PATH – CITY OF TOLEDO

MARTIN LUTHER KING JR. BRIDGE — MULTI-USE PATH – CITY OF TOLEDO

Sector

Transportation

Client

City of Toledo Department of Transportation Division of Engineering and Construction Management

Location

Toledo, OH

State

Ohio

Status

Complete

By the Numbers

Metrics

5,400 CFT

Concrete Hand Demolition

475K LBS

Counterweight Steel Hand Placed During Construction & Final Balancing

1,100 CY

Reinforced Concrete (Regular Weight)

70 CY

Reinforced Concrete (Light Weight)

30 CY

Structural Concrete (Heavy Weight)

280K LBS

Counterweight Steel Hand Removed & Staged During Construction

Challenge

Reconstruction of a 1,200-foot hybrid bridge with a widened multi-use path required innovative construction solutions, particularly for the 250-foot movable bascule span. A compressed winter schedule demanded that the bascule span remain fully operational throughout demolition and reconstruction, requiring continuous structural balancing. Additional challenges included demolishing and reconstructing oversized reinforced concrete gate arm overhangs on historic concrete arch spans, while accommodating complex geometry, aging structures, and restrictions against in-water shoring.

Solution

To maintain operation of the movable bascule span during a compressed winter schedule, ESW developed a carefully staged demolition and reconstruction plan that relied on continuous structural balancing using counterweight adjustments and a custom access/debris platform over the river. For the reinforced concrete gate arm overhangs, ESW designed an innovative cantilevered counterweight shoring system that enabled construction of the oversized suspended overhangs without in-water supports while preserving the bridge’s historic architectural character. The work required extensive structural engineering and logistical coordination throughout construction.

MLK Bridge Multi-use Paths — E.S. Wagner project photo

Project Scope

E.S. Wagner Company completed the pedestrian infrastructure upgrade for the Martin Luther King Jr. Bridge spanning the Maumee River in Toledo, Ohio. The primary objective of the project was to transform the existing sidewalk into a multi-use path across the entire 1,200-foot bridge, connecting East Toledo to key waterfront parks, while significantly improving pedestrian safety and accessibility. Key features include a widened pedestrian walkway increased from 8 to 12 feet, combination concrete and steel traffic barrier, and reinforced concrete cantilever platforms to house the traffic gate arms that were previously located in the sidewalk.

Keep Exploring

Related Projects

  • I75 - I475 (US23) Interchange — E.S. Wagner project photo

    I-75/I-475 (US 23) INTERCHANGE — I-75 RECONSTRUCTION AND WIDENING

    Perrysburg, OH

    316,800 SY

    9” Concrete Pavement Removal

    206,000 TN

    Aggregate/Granular Embankment

  • I-75 Downtown Toledo — E.S. Wagner project photo

    I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION

    Toledo, OH

    33,000 CY

    of Structural Concrete

    21,503,447

    lbs. of Structural Steel Erected

  • GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II — E.S. Wagner project photo

    GREENBELT PARKWAY — NEW ROAD CONSTRUCTION PH I & II

    Toledo, OH

    384,000

    Tons Solid Waste Removal

    2.2M

    Gallons Regulated Water Management