US-30 Roadway and Bridge Construction — E.S. Wagner project photo

Our Work / Projects / US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — HANCOCK/WYANDOT

US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — HANCOCK/WYANDOT

Sector

Transportation

Client

ODOT

Location

Ohio

State

Ohio

Status

Complete

Site Size

26.6 Miles

By the Numbers

Metrics

2.0M CY

Excavation

2.4M CY

Borrow Excavation

240,000 CY

Granular Fill Produced On-Site

1.4M SY

Subgrade Stabilization

117,000 LF

Storm Drainage

256,000 CY

Aggregate Base

21

Bridge Structures

10,900 CY

Structural Concrete

2.2M LB

Reinforcing Steel

24,000 LF

Driven Foundation Piling

4

Interchanges

Challenge

Coordinating 26.6 miles of new highway construction under a single contract that integrated three independently designed project segments and bridge redesigns driven by environmental constraints, managing unstable soil and embankment conditions, while maintaining an aggressive schedule despite weather impacts and evolving site conditions.

Solution

E.S. Wagner organized and managed a joint venture allowing both partners to self-perform their specialties, maintained an aggressive schedule through multiple concurrent operations, utilized innovative technologies, and expedited excavation operations with our specialty Belt Loader. An ESW-developed quarrying operation, a multi-million-dollar Value Engineering Proposal, and an aggressive first season schedule that completed the first seven miles of the project helped overcome unseasonably wet conditions in the second season and guarantee the successful delivery of this critical U.S. 30 corridor improvement.

US-30 Roadway and Bridge Construction — E.S. Wagner project photo

Project Scope

E.S. Wagner Company served as the managing partner of a joint venture to construct 26.6 miles of new four-lane highway between Upper Sandusky and Ada, Ohio, completing the final segment of four- lane U.S. 30 connecting Canton, Ohio, to Fort Wayne, Indiana. The project included 4.4 million cubic yards of total excavation, 21 bridge structures, 117,000 linear feet of drainage, and 860,000 linear feet of underdrains. Despite environmental constraints, geotechnical challenges, and the coordination of three separate design packages under a single contract, E.S. Wagner maintained progress through focused project management and massive resource commitment. A Value Engineering Proposal replacing lime with Lime Kiln Dust for subgrade stabilization generated several million dollars in savings shared with the owner. ESW produced required granular embankment in an adjacent borrow pit by blasting and sizing rock, reducing costs, increasing efficiency, and promoting safety by reducing the volume of trucks utilizing the area roadways. The project achieved key milestone openings ahead of schedule and successfully delivered this critical transportation corridor while maintaining environmental compliance.

Keep Exploring

Related Projects

  • US-30 Roadway and Bridge Construction — E.S. Wagner project photo

    US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — WYANDOT/CRAWFORD

    Ohio

    16

    Bridge Structures

    2.3M CY

    Borrow Excavation

  • County Rd 17D-US24 Interchange — E.S. Wagner project photo

    COUNTY ROAD 17D/US24 INTERCHANGE — ODOT 250079

    Napoleon, OH

    170K CY

    Earthwork

    1,300 CY

    Structural Concrete

  • US-74 Shelby Bypass — E.S. Wagner project photo

    US-74 SHELBY BYPASS — NC-226 TO NC-150

    Shelby, NC

    5.85M CY

    Excavation

    27

    Bridges

From Proof to Partnership