US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — HANCOCK/WYANDOT
By the Numbers
Metrics
2.0M CY
Excavation
2.4M CY
Borrow Excavation
240,000 CY
Granular Fill Produced On-Site
1.4M SY
Subgrade Stabilization
117,000 LF
Storm Drainage
256,000 CY
Aggregate Base
21
Bridge Structures
10,900 CY
Structural Concrete
2.2M LB
Reinforcing Steel
24,000 LF
Driven Foundation Piling
4
Interchanges
Challenge
Coordinating 26.6 miles of new highway construction under a single contract that integrated three independently designed project segments and bridge redesigns driven by environmental constraints, managing unstable soil and embankment conditions, while maintaining an aggressive schedule despite weather impacts and evolving site conditions.
Solution
E.S. Wagner organized and managed a joint venture allowing both partners to self-perform their specialties, maintained an aggressive schedule through multiple concurrent operations, utilized innovative technologies, and expedited excavation operations with our specialty Belt Loader. An ESW-developed quarrying operation, a multi-million-dollar Value Engineering Proposal, and an aggressive first season schedule that completed the first seven miles of the project helped overcome unseasonably wet conditions in the second season and guarantee the successful delivery of this critical U.S. 30 corridor improvement.

Project Scope
E.S. Wagner Company served as the managing partner of a joint venture to construct 26.6 miles of new four-lane highway between Upper Sandusky and Ada, Ohio, completing the final segment of four- lane U.S. 30 connecting Canton, Ohio, to Fort Wayne, Indiana. The project included 4.4 million cubic yards of total excavation, 21 bridge structures, 117,000 linear feet of drainage, and 860,000 linear feet of underdrains. Despite environmental constraints, geotechnical challenges, and the coordination of three separate design packages under a single contract, E.S. Wagner maintained progress through focused project management and massive resource commitment. A Value Engineering Proposal replacing lime with Lime Kiln Dust for subgrade stabilization generated several million dollars in savings shared with the owner. ESW produced required granular embankment in an adjacent borrow pit by blasting and sizing rock, reducing costs, increasing efficiency, and promoting safety by reducing the volume of trucks utilizing the area roadways. The project achieved key milestone openings ahead of schedule and successfully delivered this critical transportation corridor while maintaining environmental compliance.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — WYANDOT/CRAWFORD
Ohio
16
Bridge Structures
2.3M CY
Borrow Excavation
-

COUNTY ROAD 17D/US24 INTERCHANGE — ODOT 250079
Napoleon, OH
170K CY
Earthwork
1,300 CY
Structural Concrete
-

From Proof to Partnership
Have a Project Like This?
Bring us your site and scope — we'll show you how E.S. Wagner delivers it.