Sector
Commercial & Industrial
-

In Progress
LEADING CONSUMER PAPER PRODUCTS MANUFACTURER — SITE DEVELOPMENT, DRIVEN PILE FOUNDATIONS, AND PROGRESSIVE DESIGN-BUILD RAW WATER/WASTEWATER TREATMENT FACILITY
Defiance, OH
1.2
Million CY Earthwork
8K CY
Structural Concrete
-

STARPLUS ENERGY — SITE DEVELOPMENT FOR EV BATTERY MANUFACTURING PLANT
Kokomo, IN
1.8M SF
Constructed and Stabilized Building Pad
390K Tons
Aggregate Base
-

CLEVELAND CLIFFS | IRON UNITS — LARGE-SCALE SITE DEVELOPMENT FOR HBI PLANT
Toledo, OH
650K CY
Earthwork
250K TN
Granular Embankment
-

CAMPBELL’S SOUP DISTRIBUTION CENTER — SITE DEVELOPMENT
Findlay, OH
400K CY
of Earthwork
20K LF
Underground Utilities
-

MENARDS DISTRIBUTION CENTER — SITE DEVELOPMENT
Holiday City, OH
1.4
Million CY Excavation
300K TN
Aggregate Base Course
-

I-85 COMMERCE CENTER WAREHOUSE — SITE PREPARATION
Salisbury, NC
268K CY
Earthwork
13,866 LF
Underground Utilities
-

INTERSTATE CHEMICAL — PROCESS PLANT SITE DEVELOPMENT
Oregon, OH
9,000 CY
Structural Concrete
12,000 SY
10” Concrete Pavement
-

DESIGN-BUILD WAREHOUSE PRESS PIT CONSTRUCTION
Rossford, OH
5700 SF
Design-Build Post and Panel Shoring
2255 CY
Pit Excavation – Inside an Existing Building
-

OHIO CAT EQUIPMENT AND PARTS FACILITY — ENTRANCE DRIVE AND SITEWORK
Perrysburg, OH
90K CY
Earthwork
16K LF
Utilities (Waterline, Sanitary sewer, and Storm Sewer)
-

TOLEDO MUD HENS STADIUM — SITE DEVELOPMENT, DEEP FOUNDATIONS, AND SHORING
Toledo, OH
63K SF
Permanent and Temporary Steel Sheet Piling
2400 FT
36” Drilled Shaft Foundations