OHIO CAT EQUIPMENT AND PARTS FACILITY — ENTRANCE DRIVE AND SITEWORK
By the Numbers
Metrics
90K CY
Earthwork
16K LF
Utilities (Waterline, Sanitary sewer, and Storm Sewer)
250 LF
3-Sided Box Culvert
Challenge
Ohio Cat’s relocation to Perrysburg, Ohio, demanded extensive site preparation and underground utility infrastructure work under a compressed construction schedule.
Solution
ESW mobilized immediately and self-performed the complete project scope, including earthwork, culvert work, underground utility installation, and the construction of three detention ponds. ESW worked with the GC to overcome several scope gaps to complete the project on schedule.

Project Scope
E.S. Wagner Company (ESW) completed the site development package for the Ohio Cat Equipment and Parts Facility in Perrysburg, Ohio. To address limited site access, ESW first constructed a 250-linear-foot three-sided box culvert, creating a reliable entrance for construction activities. ESW self-performed approximately 90,000 cubic yards of earthwork across the 39-acre site and built three detention ponds to support stormwater management. The project also included installation of 1,200 linear feet of waterline, 2,700 linear feet of sanitary sewer, and nearly 12,000 linear feet of storm sewer ranging from 4 to 30 inches in diameter, along with 63 associated structures and two casing bores for the waterline connection. Throughout construction, ESW collaborated closely with the general contractor to resolve several scope gaps and project challenges. These efforts enabled the team to deliver the site development work on a schedule that met the owner’s requirements.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

INTERSTATE CHEMICAL — PROCESS PLANT SITE DEVELOPMENT
Oregon, OH
9,000 CY
Structural Concrete
12,000 SY
10” Concrete Pavement
-

CLEVELAND CLIFFS | IRON UNITS — LARGE-SCALE SITE DEVELOPMENT FOR HBI PLANT
Toledo, OH
650K CY
Earthwork
250K TN
Granular Embankment
-

In Progress
LEADING CONSUMER PAPER PRODUCTS MANUFACTURER — SITE DEVELOPMENT, DRIVEN PILE FOUNDATIONS, AND PROGRESSIVE DESIGN-BUILD RAW WATER/WASTEWATER TREATMENT FACILITY
Defiance, OH
1.2
Million CY Earthwork
8K CY
Structural Concrete
From Proof to Partnership