Leading Consumer Paper Products Manufacturer — E.S. Wagner project photo

Our Work / Projects / LEADING CONSUMER PAPER PRODUCTS MANUFACTURER — SITE DEVELOPMENT, DRIVEN PILE FOUNDATIONS, AND PROGRESSIVE DESIGN-BUILD RAW WATER/WASTEWATER TREATMENT FACILITY

LEADING CONSUMER PAPER PRODUCTS MANUFACTURER — SITE DEVELOPMENT, DRIVEN PILE FOUNDATIONS, AND PROGRESSIVE DESIGN-BUILD RAW WATER/WASTEWATER TREATMENT FACILITY

Sector

Commercial & Industrial

Client

Leading Consumer Paper Products Manufacturer

Location

Defiance, OH

State

Ohio

Status

In Progress

Site Size

510 Acres

By the Numbers

Metrics

1.2

Million CY Earthwork

8K CY

Structural Concrete

79K FT

Driven Piles

34K LF

Underground Utilities

226K TN

Granular Embankment

Challenge

Execute the construction of the paper manufacturing facility site infrastructure simultaneously with the design-build development and delivery of the raw water intake and compliant after-use wastewater discharge treatment plant.

Solution

ESW, alongside our D|B partners, brings integrated technical expertise and value engineering to execute the project

Leading Consumer Paper Products Manufacturer — E.S. Wagner project photo

Project Scope

E.S. Wagner is a key contributor to one of the most exciting projects in NW Ohio, a fully integrated tissue manufacturing facility complete with manufacturing water intake, treatment, and clean discharge. ESW is advancing the site development and building pad construction while simultaneously installing nearly 80,000 feet of driven foundation piling. E.S. Wagner and our design partner are developing the design for a raw water intake and wastewater discharge facility through the progressive design-build project delivery method. The highly technical project allows us to demonstrate our considerable diversity – all in a speed-to-market critical setting with the date of product manufacturing established before mobilization began.

Keep Exploring

Related Projects

  • Toledo Mud Hens Stadium site development — E.S. Wagner project photo

    TOLEDO MUD HENS STADIUM — SITE DEVELOPMENT, DEEP FOUNDATIONS, AND SHORING

    Toledo, OH

    63K SF

    Permanent and Temporary Steel Sheet Piling

    2400 FT

    36” Drilled Shaft Foundations

  • Cleveland Cliffs — E.S. Wagner project photo

    CLEVELAND CLIFFS | IRON UNITS — LARGE-SCALE SITE DEVELOPMENT FOR HBI PLANT

    Toledo, OH

    650K CY

    Earthwork

    250K TN

    Granular Embankment

  • US-30 Roadway and Bridge Construction — E.S. Wagner project photo

    US-30 ROADWAY & BRIDGE CONSTRUCTION — OHIO DEPARTMENT OF TRANSPORTATION — WYANDOT/CRAWFORD

    Ohio

    16

    Bridge Structures

    2.3M CY

    Borrow Excavation

From Proof to Partnership

Have a Project Like This?

Bring us your site and scope — we'll show you how E.S. Wagner delivers it.