INTERSTATE CHEMICAL — PROCESS PLANT SITE DEVELOPMENT
By the Numbers
Metrics
9,000 CY
Structural Concrete
12,000 SY
10” Concrete Pavement
65K CY
Earthwork
50K TN
Aggregate
13,400 LF
Underground Utilities
Challenge
Preparing a complex industrial site while managing continuous design changes, overcoming poor soil conditions, and maintaining an aggressive late-season and wintertime construction schedule without delaying facility startup.
Solution
E.S. Wagner mitigated schedule risks through a proactive and collaborative approach that drew on vast area experience to offer design change recommendations and value engineering to enhance constructability and the efficiency of delivery. ESW self-performed the entire scope, and immediately developed site grade elevations changes to promote drainage and implemented subgrade stabilization measures to ensure pad durability and performance longevity. ESW coordinated this complex site development which also included highly technical and tolerance- critical foundation construction, concrete paving, and underground utility infrastructure on an aggressive project schedule, successfully delivering a fully prepared site ready for modular plant installation and startup.

Project Scope
E.S. Wagner Company completed the site development and foundation package for a 35-acre Sodium Methylate production facility in Oregon, Ohio, supporting a modular plant construction program on an accelerated schedule. The site work included approximately 65,000 cubic yards of earthwork, construction of two stormwater detention ponds, installation of erosion control measures, and placement of more than 50,000 tons of aggregate for roads, parking, and operational areas. ESW also coordinated installation of a 130,000-square-yard geomembrane containment liner and constructed more than 13,400 linear feet of underground utilities, including water, fire protection, sanitary sewer, and storm sewer systems. In response to owner-driven design changes, the team successfully converted major paving areas from asphalt to concrete and slip-formed approximately 12,000 square yards of 10-inch-thick pavement. The foundation scope included construction of more than 100 foundations supported by auger-cast piles and placement of over 8,800 cubic yards of concrete for process equipment and structural facilities. When unsuitable subgrade conditions were encountered, ESW rapidly implemented a soil stabilization solution, maintaining project momentum and protecting the aggressive construction schedule.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

KENNSINGTON CRYOGENIC PROCESSING — AND FRACTIONATION FACILITY
Kennsington, OH
440K CY
Earthwork Excavation
1.45M SF
Building Pad Prepared
-

WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73
Wilmington, OH
19,000 SY
Self-Performed Concrete Pavement
1.9M CY
Borrow Excavation
-

OHIO CAT EQUIPMENT AND PARTS FACILITY — ENTRANCE DRIVE AND SITEWORK
Perrysburg, OH
90K CY
Earthwork
16K LF
Utilities (Waterline, Sanitary sewer, and Storm Sewer)