INTERSTATE CHEMICAL — PROCESS PLANT SITE DEVELOPMENT

Sector

Commercial & Industrial

Client

Interstate Chemical

Location

Oregon, OH

State

Ohio

Status

Complete

By the Numbers

Metrics

9,000 CY

Structural Concrete

12,000 SY

10” Concrete Pavement

65K CY

Earthwork

50K TN

Aggregate

13,400 LF

Underground Utilities

Challenge

Preparing a complex industrial site while managing continuous design changes, overcoming poor soil conditions, and maintaining an aggressive late-season and wintertime construction schedule without delaying facility startup.

Solution

E.S. Wagner mitigated schedule risks through a proactive and collaborative approach that drew on vast area experience to offer design change recommendations and value engineering to enhance constructability and the efficiency of delivery. ESW self-performed the entire scope, and immediately developed site grade elevations changes to promote drainage and implemented subgrade stabilization measures to ensure pad durability and performance longevity. ESW coordinated this complex site development which also included highly technical and tolerance- critical foundation construction, concrete paving, and underground utility infrastructure on an aggressive project schedule, successfully delivering a fully prepared site ready for modular plant installation and startup.

Interstate Chemical — E.S. Wagner project photo

Project Scope

E.S. Wagner Company completed the site development and foundation package for a 35-acre Sodium Methylate production facility in Oregon, Ohio, supporting a modular plant construction program on an accelerated schedule. The site work included approximately 65,000 cubic yards of earthwork, construction of two stormwater detention ponds, installation of erosion control measures, and placement of more than 50,000 tons of aggregate for roads, parking, and operational areas. ESW also coordinated installation of a 130,000-square-yard geomembrane containment liner and constructed more than 13,400 linear feet of underground utilities, including water, fire protection, sanitary sewer, and storm sewer systems. In response to owner-driven design changes, the team successfully converted major paving areas from asphalt to concrete and slip-formed approximately 12,000 square yards of 10-inch-thick pavement. The foundation scope included construction of more than 100 foundations supported by auger-cast piles and placement of over 8,800 cubic yards of concrete for process equipment and structural facilities. When unsuitable subgrade conditions were encountered, ESW rapidly implemented a soil stabilization solution, maintaining project momentum and protecting the aggressive construction schedule.

Keep Exploring

Related Projects

  • Kensington Cryogenic Processing and Fractionation Facility — E.S. Wagner project photo

    KENNSINGTON CRYOGENIC PROCESSING — AND FRACTIONATION FACILITY

    Kennsington, OH

    440K CY

    Earthwork Excavation

    1.45M SF

    Building Pad Prepared

  • Wilmington Bypass State Route 73 — E.S. Wagner project photo

    WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73

    Wilmington, OH

    19,000 SY

    Self-Performed Concrete Pavement

    1.9M CY

    Borrow Excavation

  • Ohio Cat Equipment and Parts Facility — E.S. Wagner project photo

    OHIO CAT EQUIPMENT AND PARTS FACILITY — ENTRANCE DRIVE AND SITEWORK

    Perrysburg, OH

    90K CY

    Earthwork

    16K LF

    Utilities (Waterline, Sanitary sewer, and Storm Sewer)

From Proof to Partnership

Have a Project Like This?

Bring us your site and scope — we'll show you how E.S. Wagner delivers it.