Our Work / Projects / I-85 COMMERCE CENTER WAREHOUSE — SITE PREPARATION

I-85 COMMERCE CENTER WAREHOUSE — SITE PREPARATION

Sector

Commercial & Industrial

Client

NorthPoint Development

Location

Salisbury, NC

State

North Carolina

Status

Complete

Site Size

40 Acres

By the Numbers

Metrics

268K CY

Earthwork

13,866 LF

Underground Utilities

Challenge

An unbalanced site requiring a grading plan redesign, demolition, offsite roadway work, and wintertime earthwork alongside extensive utilities and retaining walls with complex sequencing demands, further complicated by railroad coordination and strict erosion control, safety, and schedule requirements.

Solution

ESW coordinated and completed a grading plan revision while mobilizing an additional earthwork spread to advance the project schedule before inclement seasonal weather further impacted it. Careful sequencing, proactive coordination, responsible management of costly chemical soil manipulation, and strong erosion and safety controls ensured efficient, on-time delivery.

I85 Commerce Center Warehouse — E.S. Wagner project photo

Project Scope

E.S. Wagner Company performed the full earthwork and utility package for a 676,630 SF warehouse in the I-85 Commerce Center warehouse development, delivering comprehensive site preparation. The scope included demolition of existing structures, erosion and sediment control, and mass grading of a site that was redesigned to a near-balanced condition with ESW’s assistance. ESW installed complete underground utility systems, including storm sewer, sanitary sewer, and domestic water and fire protection infrastructure, with associated structures, testing, and tie-ins. Additional work included construction of two engineered retaining walls, railroad/roadway coordination, offsite roadway improvements, and an ESW-engineered and constructed aerial support of an existing sanitary sewer facility, while maintaining safety, quality control, and continuous site coordination to support timely project delivery.

Keep Exploring

Related Projects

  • Toledo Mud Hens Stadium site development — E.S. Wagner project photo

    TOLEDO MUD HENS STADIUM — SITE DEVELOPMENT, DEEP FOUNDATIONS, AND SHORING

    Toledo, OH

    63K SF

    Permanent and Temporary Steel Sheet Piling

    2400 FT

    36” Drilled Shaft Foundations

  • Starplus Energy — E.S. Wagner project photo

    STARPLUS ENERGY — SITE DEVELOPMENT FOR EV BATTERY MANUFACTURING PLANT

    Kokomo, IN

    1.8M SF

    Constructed and Stabilized Building Pad

    390K Tons

    Aggregate Base

  • Ohio Cat Equipment and Parts Facility — E.S. Wagner project photo

    OHIO CAT EQUIPMENT AND PARTS FACILITY — ENTRANCE DRIVE AND SITEWORK

    Perrysburg, OH

    90K CY

    Earthwork

    16K LF

    Utilities (Waterline, Sanitary sewer, and Storm Sewer)