CAMPBELL’S SOUP DISTRIBUTION CENTER — SITE DEVELOPMENT

Sector

Commercial & Industrial

Client

ARCO National Construction Co., Inc.

Location

Findlay, OH

State

Ohio

Status

Complete

Site Size

80 Acres

By the Numbers

Metrics

400K CY

of Earthwork

20K LF

Underground Utilities

5-Acre

Detention Basin

35K TN

Aggregate

Challenge

Large-scale earthwork, extensive underground utilities coordination, and an evolving scope, within a constricted timeline.

Solution

ESW utilized a flexible, self-performed construction approach to maintain momentum, adjusting sequencing to work efficiently around ongoing lead remediation within the building footprint. Integrated management of earthwork, aggregate placement, and nearly 20,000 LF of utilities ensured coordination and productivity, while proactively addressing scope gaps to keep the project on schedule.

Campbells Soup Distrubution Center — E.S. Wagner project photo

Project Scope

E.S. Wagner Company (ESW) completed the site development package for an 80-acre, 750,000-square-foot Campbell’s Soup distribution facility in Findlay, Ohio. The work included 400,000 cubic yards of earthwork, excavation of a 5-acre detention basin, placement of over 35,000 tons of aggregate, and installation of nearly 20,000 linear feet of underground utilities (1.5”–54”) with 63 associated structures, all primarily self-performed. Despite construction constraints from concurrent lead remediation within a former shooting range located in the building footprint, ESW maintained schedule through adaptive sequencing, while also filling scope gaps for the general contractor to support on-time project delivery.

Keep Exploring

Related Projects

  • In Progress

    PROJECT SAPPHIRE – SITE DEVELOPMENT FOR AN ADVANCED MANUFACTURING FACILITY

    Rossford, OH

    352,000

    CY Earthwork

    28,000

    TN Aggregate

  • Toledo Mud Hens Stadium site development — E.S. Wagner project photo

    TOLEDO MUD HENS STADIUM — SITE DEVELOPMENT, DEEP FOUNDATIONS, AND SHORING

    Toledo, OH

    63K SF

    Permanent and Temporary Steel Sheet Piling

    2400 FT

    36” Drilled Shaft Foundations

  • Ohio Cat Equipment and Parts Facility — E.S. Wagner project photo

    OHIO CAT EQUIPMENT AND PARTS FACILITY — ENTRANCE DRIVE AND SITEWORK

    Perrysburg, OH

    90K CY

    Earthwork

    16K LF

    Utilities (Waterline, Sanitary sewer, and Storm Sewer)