Norfolk Southern Bellevue Facility Expansion — E.S. Wagner project photo

Our Work / Projects / NORFOLK SOUTHERN BELLEVUE FACILITY — EXPANSION

NORFOLK SOUTHERN BELLEVUE FACILITY — EXPANSION

Sector

Rail Facilities

Client

Norfolk Southern Corporation

Location

Bellevue, OH

State

Ohio

Status

Complete

By the Numbers

Metrics

195K TN

Aggregates

50K LF

Storm Sewer

200K CY

Earthwork Excavation

2.3M LBS

Structural Steel

Challenge

The execution of a major facility improvement project within the confines of one of the busiest and largest active rail facilities in the Norfolk Southern network. The work would impact an over six-mile operating yard, requiring constant communication with ongoing rail operations to avoid disruptions while maintaining progress on critical infrastructure improvements.

Solution

Building on an already strong relationship with Norfolk-Southern and in close coordination with the Engineer, E.S. Wagner developed a value-engineered construction methodology that addressed unstable site conditions while creating a durable, all-weather surface to maintain project momentum. This innovative approach and redesign effort enabled ESW to meet critical milestones and complete the 21-mile classification yard on schedule.

Norfolk Southern Bellevue Facility Expansion — E.S. Wagner project photo

Project Scope

E.S. Wagner (ESW) served as the prime contractor for the expansion of the Norfolk Southern Rail Yard Facility in Bellevue, Ohio—one of the largest and busiest classification yards in the network. Work was performed within the footprint of the existing six-mile-long active yard, requiring careful coordination with ongoing rail operations. The project included major earthwork, aggregate placement, and installation of storm, sanitary, water, and exfiltration systems, along with asphalt paving, electrical, communication and signal conduit, and compressed air systems. A key component was the construction of a phased bridge structure adjacent to the active hump master retarder, supported by over 5,300 linear feet of drilled secant shafts and substantial reinforced concrete and structural steel. To overcome poor subsurface conditions, ESW implemented an innovative redesign that eliminated off-site borrow and chemical soil modification. This approach enabled the successful completion of 21 track miles of new classification yard infrastructure on schedule.

Keep Exploring

Related Projects

  • Wilmington Bypass State Route 73 — E.S. Wagner project photo

    WILMINGTON BYPASS STATE ROUTE 73 — CLINTON COUNTY STATE ROUTE 73

    Wilmington, OH

    19,000 SY

    Self-Performed Concrete Pavement

    1.9M CY

    Borrow Excavation

  • NORFOLK SOUTHERN BIRMINGHAM — REGIONAL INTERMODAL FACILITY — E.S. Wagner project photo

    NORFOLK SOUTHERN BIRMINGHAM — REGIONAL INTERMODAL FACILITY

    McCalla, AL

    1.7M CY

    Earthwork Excavation

    10

    Box Culverts

  • Kensington Cryogenic Processing and Fractionation Facility — E.S. Wagner project photo

    KENNSINGTON CRYOGENIC PROCESSING — AND FRACTIONATION FACILITY

    Kennsington, OH

    440K CY

    Earthwork Excavation

    1.45M SF

    Building Pad Prepared

From Proof to Partnership

Have a Project Like This?

Bring us your site and scope — we'll show you how E.S. Wagner delivers it.