SOUTH CROSSFIELD TAXIWAY — CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT
By the Numbers
Metrics
374,923 CY
Embankment
217,600 SY
Subgrade Preparation
695 LF
Utilities
Challenge
A project critical to CLT’s infrastructure construction programs had fallen behind, jeopardizing the schedule of the Fourth Parallel Runway initiative.
Solution
E.S. Wagner Company stepped in to take over the partially finished job site, which first meant stabilizing the site, correcting improper and incomplete work left by the previous contractor. Work adjacent to active runways and taxiways required strict safety compliance and limited work windows. ESW leveraged its other projects at CLT, rerouting superior embankment material from the ongoing NEAT project and hauling it in ESW’s specialized on-road haul units to complete the lagging embankments. This type of cross-project planning increased efficiency and recovered the Airport’s schedule.

Project Scope
E.S. Wagner Company completed the site preparation and earthwork for the South Crossfield Taxiway at Charlotte Douglas International Airport. The job required moving nearly 375,000 cubic yards of dirt, preparing over 217,000 square yards of subgrade, and installing underground utility lines. The work called for strict logistical control to pick up where a prior contractor left off without missing key deadlines. By self-performing the remaining utility connections and mass grading operations within an active airport, ESW successfully completed the project on time.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — THIRD PARALLEL RUNWAY
Charlotte, NC
10,800,000 CY
Earthwork
10,400 CY
Structural Concrete
-

CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — NORTH END AROUND TAXIWAY
Charlotte, NC
2,150,000 CY
Unclassified Excavation
151,000 CY
Unsuitable Excavation
-

In Progress
CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT — FOURTH PARALLEL RUNWAY
Charlotte, NC
5,235,000 CY
Unclassified Excavation
9,800 LF
84” & 96” Storm Drainage