SOUTH CROSSFIELD TAXIWAY — CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT

Sector

Airport Construction

Client

City of Charlotte, NC, Charlotte-Douglas International Airport

Location

Charlotte, NC

State

North Carolina

Status

Complete

Site Size

135 Acres

By the Numbers

Metrics

374,923 CY

Embankment

217,600 SY

Subgrade Preparation

695 LF

Utilities

Challenge

A project critical to CLT’s infrastructure construction programs had fallen behind, jeopardizing the schedule of the Fourth Parallel Runway initiative.

Solution

E.S. Wagner Company stepped in to take over the partially finished job site, which first meant stabilizing the site, correcting improper and incomplete work left by the previous contractor. Work adjacent to active runways and taxiways required strict safety compliance and limited work windows. ESW leveraged its other projects at CLT, rerouting superior embankment material from the ongoing NEAT project and hauling it in ESW’s specialized on-road haul units to complete the lagging embankments. This type of cross-project planning increased efficiency and recovered the Airport’s schedule.

CLT - South Crossfield Taxiway — E.S. Wagner project photo

Project Scope

E.S. Wagner Company completed the site preparation and earthwork for the South Crossfield Taxiway at Charlotte Douglas International Airport. The job required moving nearly 375,000 cubic yards of dirt, preparing over 217,000 square yards of subgrade, and installing underground utility lines. The work called for strict logistical control to pick up where a prior contractor left off without missing key deadlines. By self-performing the remaining utility connections and mass grading operations within an active airport, ESW successfully completed the project on time.

Keep Exploring

Related Projects

  • CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — Third Parallel Runway — E.S. Wagner project photo

    CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — THIRD PARALLEL RUNWAY

    Charlotte, NC

    10,800,000 CY

    Earthwork

    10,400 CY

    Structural Concrete

  • CLT - North End Turn Around PKG 1 — E.S. Wagner project photo

    CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — NORTH END AROUND TAXIWAY

    Charlotte, NC

    2,150,000 CY

    Unclassified Excavation

    151,000 CY

    Unsuitable Excavation

  • Charlotte Douglas International Airport - 4th Parallel — E.S. Wagner project photo

    In Progress

    CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT — FOURTH PARALLEL RUNWAY

    Charlotte, NC

    5,235,000 CY

    Unclassified Excavation

    9,800 LF

    84” & 96” Storm Drainage