CLT - North End Turn Around PKG 1 — E.S. Wagner project photo

Our Work / Projects / CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — NORTH END AROUND TAXIWAY

CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — NORTH END AROUND TAXIWAY

Sector

Airport Construction

Client

City of Charlotte, NC, Charlotte-Douglas International Airport

Location

Charlotte, NC

State

North Carolina

Status

Complete

Site Size

200 Acres

By the Numbers

Metrics

2,150,000 CY

Unclassified Excavation

151,000 CY

Unsuitable Excavation

14,000 LF

Storm Drainage (Up to 84”)

60+

Stormwater Structures

45,000 CY

Recycled Concrete Aggregate Produced

Challenge

Construct a critical north end-around taxiway in preparation for CLT’s Fourth Parallel Runway Program through an area of Airport property that was a notorious dumping ground during past development. Overcome extensive unsuitable soils and existing utility conflicts while working under strict height restrictions that allow for active runway operations overhead.

Solution

E.S. Wagner deployed specialty equipment that allowed for large-scale excavation while complying with active airfield proximity limitations, coordinated critical utility relocations, and proposed value engineering solutions that allowed for embankment and subgrade stabilization while limiting the cost and scope of expansive unsuitable excavation. The team worked multiple shifts to advance the project schedule and achieve Airport Runway Program milestones.

CLT - North End Turn Around PKG 1 — E.S. Wagner project photo

Project Scope

NEAT Package 1 & 2 projects were completed as precursor to Charlotte Douglas International Airport’s Fourth Parallel Runway Program, preparing more than 200 acres for future taxiway and airfield expansion. Work included over 2.1 million cubic yards of excavation, subgrade and embankment stabilization, utility removals, roadway modifications, and more than 14,000 linear feet of storm drainage infrastructure, with some installations reaching more than 30’ deep in a previous Airport disposal area. The project wrapped around the north end of CLT’s active center runway. The proximity to and work inside the Airport Operational Area forced ESW to comply with restrictive proximity and equipment height limitations, challenging the mass earthwork and forcing extensive nighttime operations and the use of specialty equipment, purposely acquired for the project.

Keep Exploring

Related Projects

  • CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — Third Parallel Runway — E.S. Wagner project photo

    CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — THIRD PARALLEL RUNWAY

    Charlotte, NC

    10,800,000 CY

    Earthwork

    10,400 CY

    Structural Concrete

  • CLT - South Crossfield Taxiway — E.S. Wagner project photo

    SOUTH CROSSFIELD TAXIWAY — CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT

    Charlotte, NC

    374,923 CY

    Embankment

    217,600 SY

    Subgrade Preparation

  • Charlotte Douglas International Airport - 4th Parallel — E.S. Wagner project photo

    In Progress

    CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT — FOURTH PARALLEL RUNWAY

    Charlotte, NC

    5,235,000 CY

    Unclassified Excavation

    9,800 LF

    84” & 96” Storm Drainage