NORFOLK SOUTHERN AUTOMOTIVE — DISTRIBUTION CENTER
By the Numbers
Metrics
1.5M CY
Earthwork
105K CY
3” Minus Stone Base
27K CY
Aggregate Base
26,540 SY
Concrete Paving
81K CY
Asphalt Paving
40K LF
Drainage & Utilities (72” to 4”) Large Sanitary Lift Station
6125 LF
Yard Air System/Compressor System
83,556 LF
Rail Track
Challenge
Executing a large-scale automotive distribution facility with extensive rail infrastructure while maintaining seamless coordination for Norfolk Southern-supplied rail, ballast, and crossing materials.
Solution
E.S. Wagner worked closely with Norfolk Southern through biweekly on-site coordination meetings to align material deliveries, track construction activities, and project milestones, resulting in on-schedule completion.

Project Scope
E.S. Wagner Company served as the prime contractor for the construction of the 155-acre Norfolk Southern Automotive Distribution Center in Fostoria, Ohio. The project included 1,049,500 cubic yards of earthwork, placement of 104,676 cubic yards of 3-inch minus stone base and 268,700 cubic yards of aggregate base, 26,540 square yards of concrete paving, 80,770 square yards of asphalt paving, 39,815 linear feet of drainage and utility infrastructure, a large sanitary lift station, and 6,125 linear feet of yard air and compressor systems. Rail work included the installation of more than 83,500 linear feet of owner-supplied track, 37 switches, and approximately 75,000 tons of ballast. To meet the aggressive schedule of 300 days to achieve operational status, E.S. Wagner accelerated winter operations by converting 52,000 cubic yards of planned earth embankment to granular embankment and coordinated closely with Norfolk Southern to integrate owner-supplied rail materials. The project was completed one month ahead of schedule and received the Ohio Asphalt Smooth Paving Award for commercial paving excellence.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

NORFOLK SOUTHERN BELLEVUE FACILITY — EXPANSION
Bellevue, OH
195K TN
Aggregates
50K LF
Storm Sewer
-

TOLEDO MUD HENS STADIUM — SITE DEVELOPMENT, DEEP FOUNDATIONS, AND SHORING
Toledo, OH
63K SF
Permanent and Temporary Steel Sheet Piling
2400 FT
36” Drilled Shaft Foundations
-

OHIO CAT EQUIPMENT AND PARTS FACILITY — ENTRANCE DRIVE AND SITEWORK
Perrysburg, OH
90K CY
Earthwork
16K LF
Utilities (Waterline, Sanitary sewer, and Storm Sewer)