National Lime and Stone — E.S. Wagner project photo

Our Work / Projects / NATIONAL LIME AND STONE — STRIPPING PROJECTS

NATIONAL LIME AND STONE — STRIPPING PROJECTS

Sector

Commercial & Industrial

Client

National Lime and Stone

Location

Carey, OH | Bucyrus, OH | Delaware, OH | Findlay, OH

State

Ohio

Status

Complete

By the Numbers

Metrics

12.3M CY

Excavation

Challenge

Over a 20-plus year period, performing numerous projects, all demanding large-scale excavation, typically in wintertime conditions. Coordinating efficient haul routes and material placement while maintaining stable site conditions and quick recovery from weather events, while allowing for uninterrupted quarrying operations.

Solution

Committing significance equipment resources to reduce schedule duration, while stablishing well- planned haul routes and ramps to maximize efficiency and safety. Implementing proactive water management controls, such as temporary drainage systems and ditching, to keep excavation areas stable and operational. Working with National Lime and Stone to match the quarrying and stripping plans to maximize the productivity of both operations.

National Lime and Stone — E.S. Wagner project photo

Project Scope

E.S. Wagner Company performed numerous stripping operations for National Lime and Stone to support quarry development and access to underlying resources. The projects included mobilization of personnel and equipment, followed by clearing and grubbing to prepare the sites for excavation. Temporary water management measures were implemented, including drainage tile intercepts and constructed ditches to maintain safe and efficient working conditions. Haul ramps were strategically placed and carefully constructed to facilitate challenging access to overburden walls and maximize productivity. The primary scopes involved the removal of overburden materials to expose usable rock deposits. Excavated materials were hauled to designated areas for stockpiling or reuse as engineered fill. Placement of fill and construction of dikes were completed to support site grading and long-term stormwater control.

Keep Exploring

Related Projects

  • In Progress

    PROJECT SAPPHIRE – SITE DEVELOPMENT FOR AN ADVANCED MANUFACTURING FACILITY

    Rossford, OH

    352,000

    CY Earthwork

    28,000

    TN Aggregate

  • Toledo Mud Hens Stadium site development — E.S. Wagner project photo

    TOLEDO MUD HENS STADIUM — SITE DEVELOPMENT, DEEP FOUNDATIONS, AND SHORING

    Toledo, OH

    63K SF

    Permanent and Temporary Steel Sheet Piling

    2400 FT

    36” Drilled Shaft Foundations

  • Ohio Cat Equipment and Parts Facility — E.S. Wagner project photo

    OHIO CAT EQUIPMENT AND PARTS FACILITY — ENTRANCE DRIVE AND SITEWORK

    Perrysburg, OH

    90K CY

    Earthwork

    16K LF

    Utilities (Waterline, Sanitary sewer, and Storm Sewer)

From Proof to Partnership

Have a Project Like This?

Bring us your site and scope — we'll show you how E.S. Wagner delivers it.