PORT CLINTON SEAWALL
By the Numbers
Metrics
29,000 SF
Permanent Steel Sheeting
21,000 SF
Stamped and Colored Concrete
600 CY
Concrete
1000 LF
Seawall
Challenge
Reconstruction and protection of the existing shoreline infrastructure, contending with unpredictable subsurface site conditions and variable lake water currents and water levels, while maintaining channel navigability with final aesthetic improvements alongside one of Lake Erie’s most heavily utilized access waterways.
Solution
ESW utilized careful pre-operation analysis, site investigation, and surgical excavation to limit the impact of subsurface conflicts with permanent sea wall sheeting installation. To promote long- term sustainability in the consistently wet environment, the team submitted and implemented a value engineering cost proposal to replace conventional steel with fiberglass reinforcement.

Project Scope
E.S. Wagner Company executed the shoreline stabilization and sea wall project along the waterfront in Port Clinton, Ohio. The primary objective was to drive 1,000 linear feet of 30’ steel sheet piling to halt active land erosion and secure the shoreline against turbulent lake currents. The project combined heavy civil engineering with high-end aesthetic finishes. Beyond the driven sheeting and the placement of 600 cubic yards of structural concrete that formed the cap on the sheeted sea wall, the scope included the installation of 21,000 square feet of decorative stamped and colored concrete. This specialized finish provided the community with a durable, visually appealing, and erosion-resistant public space.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

RESTORATION OF NORTH/SOUTH SEAWALLS — PERRY’S VICTORY & INTERNATIONAL PEACE MEMORIAL – NATIONAL PARK SERVICE
Port Clinton, OH
4925 CY
Concrete for Structures (Batched On-Island)
6875 LF
Cofferdam
-

I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION
Toledo, OH
33,000 CY
of Structural Concrete
21,503,447
lbs. of Structural Steel Erected
-

E-3 INTERNATIONAL PARK STORAGE BASIN — TOLEDO WATERWAYS INITIATIVE PH3 – CITY OF TOLEDO
Toledo, OH
19K CY
of Reinforced Concrete
64,000 SF
of Temporary Steel Sheet Piling