Bowling Green Waste Water Treatment — E.S. Wagner project photo

Our Work / Projects / LOW SERVICE PUMP STATION — CITY OF BOWLING GREEN

LOW SERVICE PUMP STATION — CITY OF BOWLING GREEN

Sector

Water & Wastewater Facilities

Client

City of Bowling Green

Location

Bowling Green, OH

State

Ohio

Status

Complete

By the Numbers

Metrics

50 FT

Diameter, 55 FT Deep Shored Excavation

754 CY

Reinforced Structural Concrete

650 CY

Low Density Fill

24”

Bored and Jacked Intake Piping

970 FT

36” Force Main

Challenge

Construction of a pump station wetwell exceeding 50 feet in depth presented significant excavation and structural challenges due to its close proximity to active roadways and existing treatment plant infrastructure. Additional complexity was introduced by the need to construct the intake structure within the river while maintaining site operations and managing environmental and logistical constraints.

Solution

E.S. Wagner constructed a below-grade pump station using a drilled H-pile and wood lagging shoring system that enabled safe excavation and concrete placement and a raw water intake system that included an in-river cast-in-place intake structure built within a cofferdam formed by driven sheet piling. Barges were used to position equipment for cofferdam installation and construction of the intake structure, while full environmental permit compliance was maintained within a State Scenic River. The project also included installation of pumps, bar screens, 24-inch piping, and a bored casing beneath River Road to create a reliable raw water conveyance system and expand treatment capacity for future growth.

Bowling Green Waste Water Treatment — E.S. Wagner project photo

Project Scope

E.S. Wagner expanded the City of Bowling Green’s water treatment plant’s capacity to meet growing community demand by creating a new raw water intake and pump station. ESW constructed a quad-plex pump station that included a 50+ foot deep wetwell, screening, vertical turbine pumps, and an above- grade pumphouse that housed all mechanical, electrical, and control functions. The project also included construction of a river intake structure and temporary access and launch facilities to support installation activities in the waterway. A casing pipe was installed beneath River Road from the river intake to the pump station, allowing raw water to be conveyed from the river to the new facility. Through innovative shoring and excavation methods and unique in-river construction capabilities, ESW safely delivered a reliable, long-term infrastructure solution that increased treatment capacity and enhanced the City’s ability to serve future population growth.

Keep Exploring

Related Projects

  • E-3 International Park Storage Basin — E.S. Wagner project photo

    E-3 INTERNATIONAL PARK STORAGE BASIN — TOLEDO WATERWAYS INITIATIVE PH3 – CITY OF TOLEDO

    Toledo, OH

    19K CY

    of Reinforced Concrete

    64,000 SF

    of Temporary Steel Sheet Piling

  • Brookford Park Retention Basin & Pump Stations — E.S. Wagner project photo

    BROOKFORD PARK RETENTION BASIN & PUMP — STATIONS

    Toledo, OH

    4500 CY

    Structural Concrete

    2

    Pump Stations

  • Put-in-Bay Perry's Monument — E.S. Wagner project photo

    RESTORATION OF NORTH/SOUTH SEAWALLS — PERRY’S VICTORY & INTERNATIONAL PEACE MEMORIAL – NATIONAL PARK SERVICE

    Port Clinton, OH

    4925 CY

    Concrete for Structures (Batched On-Island)

    6875 LF

    Cofferdam

From Proof to Partnership