HOFFMAN ROAD LANDFILL — CELL AND LINER CONSTRUCTION – CITY OF TOLEDO
By the Numbers
Metrics
515K CY
New Cell Excavation
53K CY
Compacted Clay Liner
10
Acres of Solid Waste Landfill Cell
26K CY
Sand Blanket Drainage Layer
3-Acre
Separatory Liner System
Challenge
Constructing a new landfill expansion cell and separatory liner system while overcoming challenging excavation conditions, integrating extensive liner infrastructure, and meeting the City of Toledo’s “just in time” construction schedule for state certification, so as not to interrupt service to the citizens of Toledo.
Solution
Drawing on previous project experience at this facility to overcome the expected challenging soil conditions, E.S. Wagner successfully delivered the expansion and separatory liner system through advanced planning, careful access construction, and specialized earthwork operations. Precise installation of the liner and leachate collection systems enabled seamless integration with existing infrastructure while meeting the City’s critical certification schedule.

Project Scope
E.S. Wagner Co. served as the general contractor for the City of Toledo’s construction of a new 10-acre municipal solid waste landfill cell and a 3-acre separatory liner system designed to provide additional airspace capacity. The project required excavation of approximately 515,000 cubic yards of material to depths approaching 50 feet in challenging soil conditions inherent to the Hoffman Road Landfill site. To prepare the new cell, crews placed 53,000 cubic yards of recompacted clay liner and installed more than 550,000 square feet of 60-mil HDPE geomembrane, tying the system into 1,900 linear feet of existing landfill liner. The leachate collection system included two collection sumps, 420 linear feet of 24-inch leachate removal risers, 950 linear feet of 6-inch collection piping, and 26,000 cubic yards of sand drainage material. The project was completed within nine months and met the City’s critical “just-in-time” schedule for state certification. As a result, the facility was able to maintain uninterrupted waste collection services for the citizens of Toledo.
On the Ground
Project Gallery
Final photography, captions, and any video to be supplied by ESW per project.
Keep Exploring
Related Projects
-

WASTE MANAGEMENT — EVERGREEN LANDFILL CELL 11 — CELL EXCAVATION, LINER CONSTRUCTION, CAPPING, — AND SEDIMENT POND
Northwood, OH
1.1M CY
Earthwork Excavation
22.5
Acres of New Landfill Cells
-

LIMA UP GROUND RESERVOIR
Allen County, OH
4.5M CY
Moisture Conditioned Embankment
90K TN
Slope Protection
-

ALLIED WASTE LANDFILL — NEW CELL CONSTRUCTION & WASTE RELOCATION
Carey, OH
470K CY
Waste Relocation
215K CY
Excavation
From Proof to Partnership
Have a Project Like This?
Bring us your site and scope — we'll show you how E.S. Wagner delivers it.