By the Numbers

Metrics

515K CY

New Cell Excavation

53K CY

Compacted Clay Liner

10

Acres of Solid Waste Landfill Cell

26K CY

Sand Blanket Drainage Layer

3-Acre

Separatory Liner System

Challenge

Constructing a new landfill expansion cell and separatory liner system while overcoming challenging excavation conditions, integrating extensive liner infrastructure, and meeting the City of Toledo’s “just in time” construction schedule for state certification, so as not to interrupt service to the citizens of Toledo.

Solution

Drawing on previous project experience at this facility to overcome the expected challenging soil conditions, E.S. Wagner successfully delivered the expansion and separatory liner system through advanced planning, careful access construction, and specialized earthwork operations. Precise installation of the liner and leachate collection systems enabled seamless integration with existing infrastructure while meeting the City’s critical certification schedule.

HOFFMAN ROAD LANDFILL — CELL AND LINER CONSTRUCTION - CITY OF TOLEDO — E.S. Wagner project photo

Project Scope

E.S. Wagner Co. served as the general contractor for the City of Toledo’s construction of a new 10-acre municipal solid waste landfill cell and a 3-acre separatory liner system designed to provide additional airspace capacity. The project required excavation of approximately 515,000 cubic yards of material to depths approaching 50 feet in challenging soil conditions inherent to the Hoffman Road Landfill site. To prepare the new cell, crews placed 53,000 cubic yards of recompacted clay liner and installed more than 550,000 square feet of 60-mil HDPE geomembrane, tying the system into 1,900 linear feet of existing landfill liner. The leachate collection system included two collection sumps, 420 linear feet of 24-inch leachate removal risers, 950 linear feet of 6-inch collection piping, and 26,000 cubic yards of sand drainage material. The project was completed within nine months and met the City’s critical “just-in-time” schedule for state certification. As a result, the facility was able to maintain uninterrupted waste collection services for the citizens of Toledo.

Keep Exploring

Related Projects

  • Waste Management Evergreen Landfill — E.S. Wagner project photo

    WASTE MANAGEMENT — EVERGREEN LANDFILL CELL 11 — CELL EXCAVATION, LINER CONSTRUCTION, CAPPING, — AND SEDIMENT POND

    Northwood, OH

    1.1M CY

    Earthwork Excavation

    22.5

    Acres of New Landfill Cells

  • Lima Up Ground Reservoir — E.S. Wagner project photo

    LIMA UP GROUND RESERVOIR

    Allen County, OH

    4.5M CY

    Moisture Conditioned Embankment

    90K TN

    Slope Protection

  • Allied Waste Landfill — E.S. Wagner project photo

    ALLIED WASTE LANDFILL — NEW CELL CONSTRUCTION & WASTE RELOCATION

    Carey, OH

    470K CY

    Waste Relocation

    215K CY

    Excavation