St. Joseph River Flood Control — E.S. Wagner project photo

Our Work / Projects / ST. JOSEPH RIVER FLOOD CONTROL

ST. JOSEPH RIVER FLOOD CONTROL

Sector

Flood Control Systems

Client

U.S. Army Corps of Engineers

Location

Fort Wayne, IN

State

Indiana

Status

Complete

By the Numbers

Metrics

5,500 FT

of Flood Wall, 5’ to 15’ Tall

175,000 CY

of Cohesive Embankment

155,000 TN

Rip-Rap Armor Stone Numerous Underground Infrastructure Upgrades

Challenge

Upgrade Fort Wayne’s aging flood-control system in a densely developed corridor where limited space, existing utilities, active roadways, and multiple river crossings required complex coordination and phased construction to maintain flood protection throughout the work.

Solution

E.S. Wagner executed a phased flood-control improvement program that combined levee raises, riprap armoring, and reinforced concrete floodwalls to enhance protection along critical river corridors. Through careful coordination of drainage, utility, and roadway improvements, and close collaboration with the U.S. Army Corps of Engineers and the City of Fort Wayne, ESW maintained project continuity, minimized community impacts, and successfully delivered all improvements while maintaining a perfect safety record.

St. Joseph River Flood Control — E.S. Wagner project photo

Project Scope

E.S. Wagner Company served as the prime contractor on three U.S. Army Corps of Engineers contracts to improve flood protection throughout Fort Wayne, Indiana, where recurring flooding occurred at the convergence of three major rivers. The project included raising existing flood-control dikes with approximately 175,000 cubic yards of clay and protecting them with 155,000 tons of riprap armor stone. In space-constrained areas, 5,500 linear feet of reinforced concrete floodwalls ranging from 5 to 15 feet in height were constructed. The work also included replacement of drainage outfalls, installation of gate wells and flap gates, utility replacements beneath the flood-control system, and reconstruction of adjacent roadways. These improvements significantly enhanced the region’s flood-control infrastructure and long-term resiliency. Over the four-year program, E.S. Wagner logged more than 150,000 man- hours without a lost-time accident, earning the Army Corps of Engineers Detroit District Contractor Safety Award for three consecutive years and the Army Corps of Engineers National Safety Award in the fourth year.

Keep Exploring

Related Projects

  • St. Marys Dam Spillway — E.S. Wagner project photo

    ST. MARYS DAM SPILLWAY REPLACEMENT — OHIO DEPARTMENT OF NATURAL RESOURCES

    Celina, OH

    7,000 CY

    Mass Concrete

    750 FT

    Sheet Pile Cofferdam

  • Put-in-Bay Perry's Monument — E.S. Wagner project photo

    RESTORATION OF NORTH/SOUTH SEAWALLS — PERRY’S VICTORY & INTERNATIONAL PEACE MEMORIAL – NATIONAL PARK SERVICE

    Port Clinton, OH

    4925 CY

    Concrete for Structures (Batched On-Island)

    6875 LF

    Cofferdam

  • Port Clinton Seawall — E.S. Wagner project photo

    PORT CLINTON SEAWALL

    Port Clinton, OH

    29,000 SF

    Permanent Steel Sheeting

    21,000 SF

    Stamped and Colored Concrete

From Proof to Partnership

Have a Project Like This?