# Projects

[Our Work](/our-work/) / Projects

What We Have Done

## Our Projects

Explore how E.S. Wagner Co. delivers precision heavy civil construction and site development solutions across major industrial, transportation, and infrastructure projects.

The Portfolio

## Proof, By the Numbers

Proven performance meets technical expertise. Filter our portfolio by sector, service capability, or geographic region to discover how our specialized equipment fleet and self-perform capabilities deliver certainty for high-stakes projects.

 Sector Airport Construction Commercial &amp; Industrial Earthen Containment Energy Services Flood Control Systems Rail Facilities Transportation Water &amp; Wastewater Facilities

Service Bridge Construction Concrete Paving Deep Foundations Design-Build Erosion and Sediment Control Mass Earthwork | Grading | Excavation Shoreline Protection Shoring Site Preparation | Development Stormwater Management Systems Stripping Structural Concrete Underground Utility Infrastructure Value Engineering

State Ohio Indiana Michigan North Carolina South Carolina Alabama Kentucky Pennsylvania

 

 Search  

 47 Projects

 Apply Filters 

- ![Leading Consumer Paper Products Manufacturer — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/leading-consumer-paper-products-manufacturer-hero-1.webp)In Progress
    
     
    
    [Commercial &amp; Industrial](https://www.eswagner.com/our-work/sectors/commercial-industrial/)
    
    ### LEADING CONSUMER PAPER PRODUCTS MANUFACTURER — SITE DEVELOPMENT, DRIVEN PILE FOUNDATIONS, AND PROGRESSIVE DESIGN-BUILD RAW WATER/WASTEWATER TREATMENT FACILITY
    
    Defiance, OH
    
    1.2
    
    Million CY Earthwork
    
     
    
    8K CY
    
    Structural Concrete
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/leading-consumer-paper-products-manufacturer/)
- ![Charlotte Douglas International Airport - 4th Parallel — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/charlotte-douglas-airport-fourth-parallel-runway-hero-1.webp)In Progress
    
     
    
    [Airport Construction](https://www.eswagner.com/our-work/sectors/airport-construction/)
    
    ### CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT — FOURTH PARALLEL RUNWAY
    
    Charlotte, NC
    
    5,235,000 CY
    
    Unclassified Excavation
    
     
    
    9,800 LF
    
    84” &amp; 96” Storm Drainage
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/charlotte-douglas-airport-fourth-parallel-runway/)
- ![Starplus Energy — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/starplus-energy-site-development-for-ev-battery-ma-hero-1.webp) 
    
    [Commercial &amp; Industrial](https://www.eswagner.com/our-work/sectors/commercial-industrial/)
    
    ### STARPLUS ENERGY — SITE DEVELOPMENT FOR EV BATTERY MANUFACTURING PLANT
    
    Kokomo, IN
    
    1.8M SF
    
    Constructed and Stabilized Building Pad
    
     
    
    390K Tons
    
    Aggregate Base
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/starplus-energy-site-development-for-ev-battery-manufacturing-plant/)
- ![I-75 Downtown Toledo — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/i-75-downtown-toledo-i-75-reconstruction-hero-1.webp) 
    
    [Transportation](https://www.eswagner.com/our-work/sectors/transportation/)
    
    ### I-75 DOWNTOWN TOLEDO — I-75 RECONSTRUCTION
    
    Toledo, OH
    
    33,000 CY
    
    of Structural Concrete
    
     
    
    21,503,447
    
    lbs. of Structural Steel Erected
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/i-75-downtown-toledo-i-75-reconstruction/)
- ![Greensboro Eastern Loop — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/greensboro-eastern-loop-from-us-29-to-sr-2303-hero-1.webp) 
    
    [Transportation](https://www.eswagner.com/our-work/sectors/transportation/)
    
    ### GREENSBORO EASTERN LOOP — FROM US 29 TO SR-2303
    
    Guilford County, NC
    
    3.4M CY
    
    Excavation
    
     
    
    2.3M CY
    
    Borrow Excavation
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/greensboro-eastern-loop-from-us-29-to-sr-2303/)
- ![Cleveland Cliffs — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/cleveland-cliffs-iron-units-site-package-hero-1.webp) 
    
    [Commercial &amp; Industrial](https://www.eswagner.com/our-work/sectors/commercial-industrial/)
    
    ### CLEVELAND CLIFFS | IRON UNITS — LARGE-SCALE SITE DEVELOPMENT FOR HBI PLANT
    
    Toledo, OH
    
    650K CY
    
    Earthwork
    
     
    
    250K TN
    
    Granular Embankment
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/cleveland-cliffs-iron-units-site-package/)
- ![E-3 International Park Storage Basin — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/e-3-international-park-storage-basin-toledo-waterw-hero-1.webp) 
    
    [Water &amp; Wastewater Facilities](https://www.eswagner.com/our-work/sectors/water-wastewater-facilities/)
    
    ### E-3 INTERNATIONAL PARK STORAGE BASIN — TOLEDO WATERWAYS INITIATIVE PH3 – CITY OF TOLEDO
    
    Toledo, OH
    
    19K CY
    
    of Reinforced Concrete
    
     
    
    64,000 SF
    
    of Temporary Steel Sheet Piling
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/e-3-international-park-storage-basin-toledo-waterways-initiative-ph3/)
- ![Harrison County Fractionation Hub — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/harrison-county-fractionation-hub-site-development-hero-1.webp) 
    
    [Energy Services](https://www.eswagner.com/our-work/sectors/energy-services/)
    
    ### HARRISON COUNTY FRACTIONATION HUB — SITE DEVELOPMENT FOR STORAGE AND RAIL FACILITY – PH I &amp; II
    
    Scio, OH
    
    1.2M CY
    
    Earthwork + Rock Excavation
    
     
    
    250K TN
    
    Aggregates
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/harrison-county-fractionation-hub-site-development-for-storage-and/)
- ![Put-in-Bay Perry's Monument — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/restoration-of-north-south-seawalls-perry-s-victor-hero-1.webp) 
    
    [Flood Control Systems](https://www.eswagner.com/our-work/sectors/flood-control-systems/)
    
    ### RESTORATION OF NORTH/SOUTH SEAWALLS — PERRY’S VICTORY &amp; INTERNATIONAL PEACE MEMORIAL – NATIONAL PARK SERVICE
    
    Port Clinton, OH
    
    4925 CY
    
    Concrete for Structures (Batched On-Island)
    
     
    
    6875 LF
    
    Cofferdam
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/restoration-of-north-south-seawalls-perry-s-victory-international/)
- ![CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — Third Parallel Runway — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/08/charlotte-douglas-international-airport-third-parallel-runwa-featured.jpg) 
    
    [Airport Construction](https://www.eswagner.com/our-work/sectors/airport-construction/)
    
    ### CHARLOTTE DOUGLAS — INTERNATIONAL AIRPORT — THIRD PARALLEL RUNWAY
    
    Charlotte, NC
    
    10,800,000 CY
    
    Earthwork
    
     
    
    10,400 CY
    
    Structural Concrete
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/charlotte-douglas-international-airport-third-parallel-runway/)
- ![Lima Up Ground Reservoir — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/09/lima-up-ground-reservoir-hero-1.webp) 
    
    [Earthen Containment](https://www.eswagner.com/our-work/sectors/earthen-containment/)
    
    ### LIMA UP GROUND RESERVOIR
    
    Allen County, OH
    
    4.5M CY
    
    Moisture Conditioned Embankment
    
     
    
    90K TN
    
    Slope Protection
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/lima-up-ground-reservoir/)
- ![NORFOLK SOUTHERN BIRMINGHAM — REGIONAL INTERMODAL FACILITY — E.S. Wagner project photo](https://www.eswagner.com/wp-content/uploads/2026/08/norfolk-southern-birmingham-regional-intermodal-facility-featured.png) 
    
    [Rail Facilities](https://www.eswagner.com/our-work/sectors/rail-facilities/)
    
    ### NORFOLK SOUTHERN BIRMINGHAM — REGIONAL INTERMODAL FACILITY
    
    McCalla, AL
    
    1.7M CY
    
    Earthwork Excavation
    
     
    
    10
    
    Box Culverts
    
     
    
     
    
    [View Project](https://www.eswagner.com/projects/norfolk-southern-birmingham-regional-intermodal-facility/)

1[2](?query-1-page=2)[3](?query-1-page=3)[4](?query-1-page=4)

[Next Page](/our-work/projects/?query-1-page=2)

Seen the Proof?

## Let's Build the Next One.

Bring us your site, scope, and schedule. We'll show you how we deliver.

[Contact Our Experts](/contact-locations/)