Toledo Sun Oil Refinery Modifications

Location: Toledo, Ohio

Project Value: $1,294,500.00

Project Completion Year: 2008


Over the last 30 years, E. S. Wagner has completed numerous projects at the Toledo Sun Oil Refinery. Some of the projects include the Pickle Road tank farm fire protection system that required some 10,000 linear feet of 12 inch ductile iron fire lines, a water storage basin and a fire water pump station to provide flow to the system and the Waste Water Treatment facility. This included underground piping, a reinforced concrete storm water pump station and other concrete structures. E.S. Wagner has constructed numerous storage tank foundations, clay retention dikes, underground pipe repairs and new sewer construction. E.S. Wagner maintains a number of crews and supervisors with the experience, training and knowledge to work effectively and safely in the refinery environment.