PROJECTS
|
|||
| Fort Wayne, Indiana Flood Control, Army Corp of Engineers - $24,609,196 | |||
| Scope: | Reconstruct
5 miles of existing flood control dikes and concrete flood walls, provide
5 miles of concrete and asphalt recreation trails, reconstruct drainage systems, landscaping, and reconstruction of adjacent roadways. |
||
| Specs: | Clear
and grub 40 acres of river banks concrete recreational trails |
||
| INDOT R-24058 & R-24290 Route 24, Wabash County - $33,442,185 | |||
|
Scope:
|
5 miles of new highway construction with structures. | ||
|
Specs:
|
Excavation
1,230,227 CY 1,880 LF |
||
| Bellefontaine Regional Airport Phase 1 & 2, City of Bellefontaine, Ohio - $5,131,699 | |||
|
Scope:
|
Site preparation, excavation, drainage and paving of a new 5,000 foot runway | ||
|
Specs:
|
Excavation 565,000
CY |
||
| Chrysler Plant Expansion, Toledo, Ohio - $2,921,282 | |||
|
Scope:
|
Site Preparation and remediation of 200 acres | ||
|
Specs:
|
Topsoil
removal and stockpiling 300,000 CY |
||
|
|
|||
| ODOT Project 8004(01) US 250 Erie County - $6,368,844 | |||
|
Scope:
|
Replace existing railroad bridge over US 250 including installation of temporary railroad bridge to carry train traffic until the new structure is built. | ||
|
Specs:
|
Excavation 60,000
CY |
||
|
|
|||
| ODOT Project 281(00) Wales Road Wood County - $3,487,778 | |||
|
Scope:
|
Bridge widening and interchange reconstruction | ||
|
Specs:
|
Remove existing
bridge deck, provide new substructure and superstructure to widen existing
bridge |
||
| ODOT Project 424(00) Tiffin Ave. Bridge Lucas County -$2,954,288 | |||
|
Scope:
|
Construct new bridge over CSX railroad complete with approach roadway. | ||
|
Specs:
|
New
468' long, four span steel Girder bridge |
||
|
ODOT 8007(00), I-75 Lucas County - $17,086,711 |
|||
|
Scope:
|
Remove and replace I-75 bridges over Berdan, Detroit and Phillips Avenues including repair and asphalt paving of roadway. | ||
|
Specs:
|
Remove and replace
I-75 bridge over Berdan/Detroit, a 2,200' long twin structure with 5,700
CY of reinforced concrete decks. Each deck had to be removed and replaced
in 120 days under a $10,000.00 per day penalty/incentive |
||
|
|
|||
| Grimes Field - Realignment of Runway 5-23, City of Urbana, Ohio - $2,700,560 | |||
|
Scope:
|
Site preparation, excavation, drainage and paving of a new 4,400 foot runway | ||
|
Specs:
|
Excavation 267,000
CY |
||
| Waste Management of Ohio | |||
| Scope: | Construction of two (2) new landfill cells and sedimentation pond. | ||
| Specs: | Excavation
of one (1) 3.5 acre cell, one (1) 7.5 acre cell and one (1) 6 acre sedimentation
pond totaling 650,000 CY |
||
| Allied Waste - Ohio | |||
|
Scope:
|
Landfill Cell Construction/waste relocation | ||
|
Specs:
|
Construction
of 6 acre landfill cell and 3 acre sedimentation pond |
||
| OTC 43004 795 & Oregon Rd. Bridges - $6,932,508 | |||
|
Scope:
|
Remove and replace 3 structures over the Ohio Turnpike for future third lane widening. | ||
|
Specs:
|
Remove
existing Oregon Road bridge over Ohio Turnpike and replace with a new structure
|
||
| National Lime Stripping | |||
|
Scope:
|
Excavate and spoil 3,500,000 CY of limestone quarry overburden for National Lime and Stone Company under a multi-year agreement. | ||
|
|
|||
| Toledo Mud Hens Stadium City of Toledo - $2,198,321 | |||
|
Scope:
|
Site work for new Toledo Mudhen's Baseball Stadium | ||
|
Specs:
|
Furnish
and install 750' of temporary and 650' of permanent steel sheet piling Miscellaneous perimeter roadway drainage |
||
|
|
|||
| ODOT 0083(01) SR 15 - $3,906,187 | |||
|
Scope:
|
New interchange at SR 15 and SR 37 | ||
|
Specs:
|
Excavation
52,855 CY |
||
| ODOT 0059(01) I-280 Lucas County - $11,405,362 | |||
|
Scope:
|
Interstate rehabilitation including excavation, drainage, retaining walls, bridge and paving. | ||
|
Specs:
|
Excavation
95,000 CY Concrete retaining & sound wall 1,800 FT |
||
|
|
|||
| ODOT 199(01) SR 30 Wyandot and Crawford Counties - $75,361,769 | |||
|
Scope:
|
E.S. Wagner Company is the managing partner for this joint venture project in the construction of 10.83 miles of a new four lane highway between Upper Sandusky and Bucyrus, Ohio. | ||
|
Specs:
|
Excavation
1,132,024 CY |
||
|
|
|||
| ODOT Project 023(00) SR 2, Erie County - $23,724,306 | |||
|
Scope:
|
Pavement rehab and replacement of 8.3 miles of four lane highway including substructure concrete and deck replacement of eleven bridges. | ||
|
Specs:
|
Pavement removal
132,100 SY 304 Aggregate subbase 47,650 CY |
||
| Tyler Landfill Closure, Toledo, Ohio - $1,478,355 | |||
|
Scope:
|
Waste re-grading, slope protection and final cap. | ||
|
Specs:
|
Clearing
35 acres |
||